Archive for March, 2016

Spear Point on site and progressing well! – March 2016

On February 1st 2016 Coastal Construction began work on site at Spear Point, Portloe on the Roseland. A month into the project has seen a lot of progress made already, which includes the excavation for foundations and foundations poured for the new extension.

The substructure blockwork and block and beam concrete floors are also in place. There is a proposed Sunroom at the back of the property and the required retaining wall for this has also been built.

The relevant areas within the existing shell have been stripped out for the current works being carried out and things are progressing well. We look forward to regular updates with how things are going and will give updates periodically of this.